West White Rose Project

Procurement Opportunities will be posted on this website. Interested companies are advised to check regularly.

Husky is the operator and majority owner of the White Rose field and satellite extensions.

The original White Rose field was developed using subsea technology, consisting of three drill centres tied back to a Floating, Production, Storage and Offloading (FPSO) vessel. Production is provided by subsea wells in the Southern and Central drill centres while surplus gas is re-injected into the Northern Drill Centre for future extraction. The North Amethyst and South White Rose extensions all produce back to the SeaRose FPSO.  

The West White Rose Project will access further resources to the west of the field, using a fixed drilling rig tied back to the existing SeaRose FPSO.

First oil is expected in 2022.